Current/ongoing Projects


SL NO

Name of the Project

Customer

Quantity

Scope of Works

1

BWDC Wimax Project (Multinet)

ZTE Corporation Bangladesh Limited


257  sites

Drive Test with Configuration & Function Test, Throughput Test, RSSI Coverage Test, CINR Coverage Test, Downlink MCS & Throughput Test, TX Power Test, FTP Download & Upload, Recommendation with Report submission

2

Airtel new sites Integration

Ericsson Bangladesh Limited

1500 sites

Single site verification, Functionality checking, parameters verification, Coverage & Quality measurement, Feeder swap checking, single site report   with recommendation

3

Frame Agreement for skilled manpower service

ZTE Corporation Limited

System Engineer (12), RF Engineer (6),Technicians (8)

System engineer for Wimax system, RF drive Test & Reporting engineer for Wimax system and skilled technicians for single site verification




4

Out Door Drive Test Service

Grameen Phone Limited

3200 sites    (8400 KM)

2G & 2.5 G Drive Test Log Collection, Drive Test Log post Processing & Report Generation, Black Spot identification with recommendation on bad Coverage & Quality, Call Drop, Overshooting coverage, Frequent handover/Handover failure, Network abnormalities, Recommendation & Report submission


5

IBS Drive Test Service

Grameen Phone Limited

200000 Square Meter

2G & 2.5G Drive Test Log Collection, Drive Test Log post Processing & Report Generation, Black Spot identification with recommendation on bad Coverage & Quality, Call Drop, Spillage, Frequent handover/ Handover failure, Network abnormalities. Recommendation & Report Submission


6

BTS & BSC Relocation” Under the Project Titled “Introduction of 3G Technology and Expansion of 2.5G Network”

Teletalk Bangladesh Limited


559 Sites

Radio Network simulation and planning, Frequency  and Neighbor planning, present network audit, New sites integration , Drive with coverage and quality verification, parameters tuning, Meet Target KPI.


7

Robi ALU Swap

LM Ericsson Bangladesh Limited

400 sites swap,25 cluster (Pre&Post)Drive Test

Call test,Upload data test, Ping test,Handover test,
Functionality checking,Physical parameters verification, Coverage & Quality measurement, Feeder swap checking, single site report   with recommendation,Pre & Post cluster Report with recommendation,After completion DT also recommend to physical optimization.

 

News & Events

Previous Next
News item title 1 The Pi Technologies Core Team and Working Group members are volunteer developers, designers, administrators and managers... Read more
News item title 2 The Pi Technologies! team has millions of good reasons to be smiling about the Pi Technologies! 1.5. In its current inca... Read more